RoboticNaruto4693 RoboticNaruto4693
  • 03-01-2018
  • Physics
contestada

How much work is done when a hoist lifts a 290-kg rock to a height of 7 m?

Respuesta :

samuraijack
samuraijack samuraijack
  • 03-01-2018
Given: Mass m = 290 Kg;  Height  h = 7 m

Required: Work = ?

Formula: Work = Force x distance  but, Force F = mg

W= fd

W = mgh

W= (290 Kg)(9.8 m/s²)(7 m)

W = 19,894 Kg.m²/s²

W = 19,894  J




  
Answer Link

Otras preguntas

a grown tiger begin its life as a single fertilized egg explain why a tiger look so much different as an adult then it did as a single fertilized eggEnter your
which fraction is between 0 and 2/4
what was the effect of the persian wars?
mr. Robbins has $2,730 in his checking account and $11,019 in his savings account. Round to the nearest hundred and add to find about how much money he has in b
What is the y intercept of this line y+4=-4(x-2) Rewrite this equation in standard form What is the x intercept of this line What is the equation in standard fo
describe what would be true about the rate of change in a situation that could be represented by a graphed line and an equation in the form y=mx + b
How many outer electrons does phosphorus have
Why is external criticism so important when it comes to analyzing data?
what did sr isaac newton contribute to scientific thinking and knowledge
The __________ gave women the right to vote.