Impossible7432 Impossible7432
  • 01-12-2021
  • Business
contestada

A method of cost assignment where a cost can be associated to the particular cost object in an economically feasible way is called ________.

Respuesta :

RealGiveaway
RealGiveaway RealGiveaway
  • 01-12-2021

Answer:

indirect costs

Explanation:

costs related to a particular cost object that cannot be traced to that cost object in an economically feasible way. cost assignment. general term for assigning costs, whether indirect or direct.

I hope it helps.

Answer Link

Otras preguntas

Can someone please help quick
Carlos bought 29 pounds of rice for $12 How many pounds of rice did he get per dollar?
Read the following text. Main idea: Wind power is becoming an increasingly popular source of renewable energy in the United States. Which of the following detai
Select the inequality that corresponds to the given graph. Graph with a y-intercept at 0 comma 1 and a second point at negative 4 comma 0. This is a dashed li
Between 1950 and 2010, more than _____ children died before age 5.
Specialization of labor and trade yield greater economic efficiency when applied to interstate? trade,
How much work is done if you push a box 200 meters with a force of 35 newtons answer?
You and other scientists have been able to get the same results after many experiments. What is this proven data called?
The momentum before a collision of three objects is always greater than the momentum after the collision. T F
Humans with damage to the amygdala show decreased