MaThWiZz6123 MaThWiZz6123
  • 02-07-2021
  • Mathematics
contestada

It take 4 people 40 minutes to clean a garden. How long will it take 6 people to clean the same garden

Respuesta :

loconte loconte
  • 02-07-2021

Answer:

4/9 of an hour (26.666 minutes)

Step-by-step explanation:

4 * x * 40/60 = 1

x * 160/60 = 1

x=60/160 = 6/16 = 3/8 (this is the rate for one worker)

~~~~~~~~~~~~~~~~

6 * (3/8) * x = 1

x = 4/9

Answer Link

Otras preguntas

—¿Cómo estás, Carlos? —No _____ muy bien. A. estás B. estoy C. están D. estamos
during the cold war era, the soviet union believed one political party should be representing during government elections ,while the united states argued
The speed of light is 3.00×108m/s. How long does it take for light to travel from Earth to the Moon and back again?
Let’s assume that one drop is equal to 50 µl. a total of 2366 drops will fill how many tablespoons?
Slopes that drop or rise sharply in elevation are:
A certain city has 2,340 pets of these pets 1/4 are cats, 1/5 are dogs, 1/10 are horses, 1/9 are frogs 1/4 are fish, and the rest are various other types how ma
I need help with question 8
A company's prime costs total $4,800,000 and its conversion costs total $8,800,000. if direct materials are $1,900,000 and factory overhead is $5,900,000, then
34 days to 2 weeks the ratio is
Which cultural syndrome involves anxiety about losing semen through nocturnal emissions, masturbation, and urination?