leila839 leila839
  • 03-02-2021
  • Mathematics
contestada

Q11.
It takes 3 painters 2 days to complete a job. Work out how long 1 painter would take.

Respuesta :

26liujiaying
26liujiaying 26liujiaying
  • 03-02-2021

Answer:

6

Step-by-step explanation:

1 painter is 1/3 of 3 painters, so the answer is 2 x 3=6

Hope I helped!

Answer Link

Otras preguntas

placing 12 tiles side by side, Pete can make a 12-by-1 rectangle. Name two other rectangles Pete can make with 12 tiles
Explain how you would use a number line to find 6+(-8)
A box is lowered using a rope. If the acceleration of the box, is 2.5 m/s2 (downward) and the tension in the rope is 31 N, what is the mass of the box (in kg)?
What are the two largest ethnic groups in the united states today?
the student council president wants to find out the opinion of the students on the issue of school lunch options. The president sends out a survey to a random
Factor the expression -10x^2-41x-21
which property you used.64+58=                    +64
How do I solve c/4d divided by 3/8d
What are the natural resources in venice,italy?
The most commonly spoken language in the Fertile Crescent around the time of Jesus was