medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

you move right 3 units and left 4 units. you end at (-3,-1). where did you start?​
This rectangular patio is tiled using 50 cm by 50 cm square tiles. How many tiles are used?
If QR = 9 and ST = 13 calculate LM.
In the following diagram, four different index fossils are labeled: In this diagram, from top to bottom, an index fossil from the Jurassic period is labeled A,
According to the map above, what is the risk of catching malaria while living in Africa? A. There is very little chance of catching malaria in sub-Saharan Afric
PLEASE ANSWER ASAP!!!Fill in the box for the missing numerator in the set of equivalent expressions in the pictureAnswer options are also shown in pictureany un
Can someone check my Latin homework? 1. Ambulando montem ascenderunt. They have climbed the mountain by walking. 2. Signum deo donandum est. A sign is to be gi
PLEASE help me solve this question! I really need to solve this question ASAP! No nonsense answers, and please attach the solution.
Nine-tenths of a 70 foot long driveway has already been paved. How many feet of the driveway have been paved so far?
what is physics and important of physics​